Search IEAHydro.org
Hydropower News:

Click on the following links for the latest in IEA Hydro's activities, hydropower news & hydro happenings, world-wide.

April 4 - 6, 2011 in Washington, D.C., at the 2011 National Hydropower Association Annual Conference,
http://www.nationalhydroconference.com/index.html

Hydrovision International will be held in Louisville, Kentucky 17-20 July, 2012. For more information...

International Journal on Hydropower & Dams will host the HYDRO 2012  International Conference and Exhibition in Bilbao, Spain, 29-31 October, 2012. Call for papers and information brochure....

The India Institute of Technology, Roorkee, India, offers an International Training Programme on Rural Electrification With Small Hydropower. 6 -17 March, 2012; 21 May - 2 June, 2012 and 20 May - 1 June, 2013 only for participants from African Countries. See brochure for more details ...

The Roorkee Institute is also offering a Masters of Technology programme in Alternate Hydro Energy Systems. For criteria of entry & prospectus ...

The International Centre for Hydropower (ICH), Trondheim, Norway, has announced courses for 2012. See the ICH website for details...

International Water Power & Dam Construction now has a free, fully searchable database of articles and news stories 1998 -present. 

 

 

How much more power can be produced by refurbishing older projects?

In some situations, increased rating and efficiency can be obtained by runner replacement. For pre-1960 turbines, it is frequently possible to obtain output increases as high as 30 percent, and efficiency increases of more than 5 percent, by replacing existing runners with runners of improved design.

The former requirement that generators deliver rated output with no more than a 60C temperature rise, and the conservative safety factors provided by early generator manufacturers, result in the possibility of substantial increases in machine capacity by installing windings using modern insulation technology which can provide increased electrical capacity with the same physical size as earlier manufactured windings.

Therefore, it is often possible to increase the capacity of older units by installing new stator windings and improved runners, and by upgrading various auxiliary equipment. Apart from technical limitations, the economic value of capacity is most important in justifying a refurbishment.

The practical limit of uprating is reached when the cost of replacing equipment to obtain additional capacity equals the economic worth of that added capacity.

 